Airworthiness · Traceability Guide

EASA Form 1 vs FAA 8130-3 vs UK CAA Form 1: Release Certificates Explained

A part that is physically right can still be unusable if its paperwork is wrong. This guide explains what EASA Form 1, FAA 8130-3 and UK CAA Form 1 each certify, and how dual release fits in.

Published 30 October 2026·7 min read·Directors of maintenance, CAMOs & buyers

What a release certificate actually says

An authorised release certificate is the document that tells a maintenance organisation what has been done to a part, who did it and under which approval. It is the link between a component and the airworthiness system that allows it to be fitted.

The three forms below do the same job under different authorities. Which one your aircraft's regulator accepts depends on its register and your maintenance organisation's approvals. Always confirm with your CAMO or quality manager before purchase.

The three forms

FAA Form 8130-3. The FAA's Authorized Release Certificate (Airworthiness Approval Tag). It is issued by the FAA or by an authorised organisation, for example a production approval holder or a certificated repair station, for new, overhauled or repaired parts.

EASA Form 1. The EASA Authorised Release Certificate. Part 21 production organisations use it for new parts, and Part-145 maintenance organisations use it to certify maintenance, repair or overhaul.

UK CAA Form 1. The UK's equivalent, introduced after the UK left the EASA system. Whether a part released on a different authority's form is accepted on a UK-registered aircraft depends on current UK rules, so verify before you buy.

Dual release

Some organisations hold approvals under both the FAA and EASA systems and can issue a single certificate that carries both releases. For an operator running aircraft on different registers, or a part that may move between them, dual release removes a second round of paperwork.

Do not assume a dual release exists. Ask for it at the quote stage, and confirm that the release statement matches the work performed.

Trace documents that travel with the form

Non-incident statement. A declaration that a used part has not been involved in an accident or serious incident, fire or similar exposure. Many operators require it for pre-owned components.

Back-to-birth trace. A documented history from manufacture. It is expected for life-limited parts, where cycles and hours must be provable.

Certificate of conformity for new parts and materials, where the supplier confirms the product meets its specification.

Red flags that cause a part to be rejected

Part number, serial number or description on the form does not match the part.

Block 12 or remarks do not describe the work or state a return-to-service basis.

No signature, stamp, approval number or date, or the approval does not cover the part.

Used part without a non-incident statement or with gaps in its history.

A photocopy where the operator's procedures require an original or verified copy.

Each of these can turn a located part into a second AOG delay at the ramp. Checking them before dispatch is cheaper than checking them on arrival.

How Aircraft Program handles it

Documentation is verified before a part is dispatched, and the release and trace records are filed to your aircraft's Parts Passport so they are available for audits and future sales. See the Parts Passport or the parts sourcing desk.

Submit an AOG request or pre-enrol your aircraft in five minutes.